Why buyers look at Belgium
For the latest public statistics and context on Belgium's manufacturing and robotics market, see the market page on this site; we only publish figures we can source.
This guide walks through the sourcing process step by step, whether you need a single welding cell, a fleet of mobile robots or a complete production line from Belgium.
Step 1: Write the brief before you look for suppliers
Supplier proposals are only as good as the brief. Describe the process, not the robot you think you need.
- Application: welding, palletizing, machine tending, assembly, inspection or intralogistics
- Part or load: drawings, weight, dimensions, material and variants
- Throughput: target cycle time, shifts and expected uptime
- Site: floor space, utilities and the machines the cell must connect to
- Destination country, compliance marks required and who installs
- Budget range and target delivery date
Step 2: Decide whether you need a robot, a cell or a line
Some suppliers in Belgium build robots; many more are integrators who design cells around robot brands from several countries. Decide where your scope boundary sits. If you have your own integration team, you may only need equipment. If you want a working system in your plant, you need an integrator who takes responsibility for the whole cell, including fixtures, safety and controls.
Step 3: Build a shortlist of three to five suppliers
Screen for demonstrated experience with your application, not general capability statements. Ask for comparable references, the share of work that is exported and the destination markets they have delivered to. Confirm the workshop address and what is done in-house.
Step 4: Ask for proof that the application runs
Ask to see your parts, or close analogues, run on video or at the workshop. Agree in writing what success looks like at the factory acceptance test and at the site acceptance test.
Step 5: Lock compliance, language and service
Say where the cell will be installed and which marks you need (CE or the EU Machinery Regulation in Europe, UL/CSA/NRTL in North America). Agree who writes the risk assessment, the manuals language, training, spare parts and who attends a stoppage.
Step 6: Price the landed cell, not just the arm
Ask for a breakdown that separates the robot, tooling, safety, controls, software, installation, training, freight, insurance, duties and taxes. Name the Incoterms 2020 rule you want and who buys insurance.
Step 7: Share a brief
If you want help building a shortlist in Belgium, send a short brief through this site. We will come back with next steps. This is not a substitute for your own technical due diligence.